A. 2.2.1.1. Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter | ||||||
Harga | Jumlah | |||||
No | Uraian | Kode | Satuan | Koefisien | Satuan | Harga |
(Rp) | (Rp) | |||||
A | TENAGA | |||||
Pekerja | L.01 | OH | 0,400 | 88.193,60 | 35.277,440 | |
Tukang kayu | L.02 | OH | 0,200 | 123.490,40 | 24.698,080 | |
Kepala tukang | L.03 | OH | 0,020 | 130.549,76 | 2.610,995 | |
Mandor | L.04 | OH | 0,020 | 137.609,12 | 2.752,182 | |
JUMLAH TENAGA KERJA | 65.338,698 | |||||
B | BAHAN | |||||
Dolken kayu f 8-10/400 cm | Batang | 1,250 | 25.000,00 | 31.250,000 | ||
Semen portland | Kg | 5,000 | 1.240,00 | 6.200,000 | ||
Pasir beton | m3 | 0,005 | 289.255,00 | 1.446,275 | ||
Koral beton | m3 | 0,009 | 216.353,33 | 1.947,180 | ||
Kayu 5/7 | m3 | 0,072 | 4.938.500,00 | 355.572,000 | ||
Paku biasa 2” – 5” | Kg | 0,060 | 15.000,00 | 900,000 | ||
Residu | Liter | 0,400 | 35.275,00 | 14.110,000 | ||
JUMLAH HARGA BAHAN | 411.425,455 | |||||
C | PERALATAN | |||||
JUMLAH HARGA ALAT | ||||||
D | Jumlah (A+B+C) | 476.764,153 | ||||
E | Overhead & Profit 10 % | 10% x D (maksimum) | 47.676,415 | |||
F | Harga Satuan Pekerjaan (D+E) | 524.440,568 |
A. 2.2.1.1. Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Tags: