No | Uraian | Satuan | Koefisien | |
A | TENAGA | |||
Pekerja | OH | 1.500 | ||
Tukang batu | OH | 0.750 | ||
Kepala tukang | OH | 0.075 | ||
Mandor | OH | 0.075 | ||
B | BAHAN | |||
Batu belah | m3 | 1.200 | ||
Semen Portland | Kg | 202.000 | ||
Pasir pasang | m3 | 0.485 |
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP