Uraian | Satuan | Koefisien | |
TENAGA | |||
Pekerja | OH | 1,500 | |
Tukang batu | OH | 0,750 | |
Kepala tukang | OH | 0,075 | |
Mandor | OH | 0,075 | |
BAHAN | |||
Batu belah | m3 | 1,200 | |
Semen Portland | Kg | 0.170 | |
Kapur | m3 | 0,170 | |
Pasir pasang | m3 | 0,340 |
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP
Tags: