Uraian | Satuan | Koefisien | Satuan |
(Rp) | |||
TENAGA | |||
Pekerja | OH | 0.06 | 90,000.00 |
Tukang las konstruksi | OH | 0.06 | 100,000.00 |
Kepala tukang | OH | 0.006 | 110,000.00 |
Mandor | OH | 0.003 | 125,000.00 |
BAHAN | |||
Besi baja IWF | Kg | 1.150 | 15,000.00 |
Pemasangan 1 kg rangka kuda-kuda baja IWF
Tags: