| Uraian | Satuan | Koefisien |
| TENAGA | ||
| Pekerja | OH | 0.300 |
| Tukang batu | OH | 0.150 |
| Kepala tukang | OH | 0.015 |
| Mandor | OH | 0.015 |
| BAHAN | ||
| PC | Kg | 6.240 |
| PP | m3 | 0.024 |