| Harga | Jumlah | |||||
| No | Uraian | Kode | Satuan | Koefisien | Satuan | Harga |
| (Rp) | (Rp) | |||||
| A | TENAGA | |||||
| Pekerja | L.01 | OH | 0,200 | 88.193,60 | 17.638,720 | |
| Tukang kayu | L.02 | OH | 0,300 | 123.490,40 | 37.047,120 | |
| Kepala tukang | L.03 | OH | 0,020 | 130.549,76 | 2.610,995 | |
| Mandor | L.04 | OH | 0,020 | 137.609,12 | 2.752,182 | |
| JUMLAH TENAGA KERJA | 60.049,018 | |||||
| B | BAHAN | |||||
| Dolken kayum f 8-10/400 cm | Batang | 1,000 | 25.000,00 | 25.000,000 | ||
| Semen portland | Kg | 2,000 | 1.240,00 | 2.480,000 | ||
| Kawat duri | M’ | 25,000 | 3.383,33 | 84.583,333 | ||
| Pasir beton | m3 | 0,005 | 289.255,00 | 1.446,275 | ||
| Koral beton | m3 | 0,009 | 216.353,33 | 1.947,180 | ||
| Paku biasa 2” – 5” | Kg | 0,060 | 15.000,00 | 900,000 | ||
| JUMLAH HARGA BAHAN | 116.356,788 | |||||
| C | PERALATAN | |||||
| JUMLAH HARGA ALAT | ||||||
| D | Jumlah (A+B+C) | 176.405,806 | ||||
| E | Overhead & Profit 10 % | 10% x D (maksimum) | 17.640,581 | |||
| F | Harga Satuan Pekerjaan (D+E) | 194.046,387 | ||||