| No | Uraian | Kode | Satuan | Koefisien | Harga Satuan (Rp) | Jumlah Harga (Rp) |
| A | TENAGA | |||||
| Pekerja | L.01 | OH | 0,150 | 88.193,60 | 13.229,04 | |
| Tukang kayu | L.02 | OH | 0,050 | 123.490,40 | 6.174,52 | |
| Kepala tukang | L.03 | OH | 0,005 | 130.549,76 | 652,75 | |
| Mandor | L.04 | OH | 0,008 | 137.609,12 | 1.100,87 | |
| JUMLAH TENAGA KERJA | 21.157,18 | |||||
| B | BAHAN | |||||
| Kayu kelas III (papan MC) | m3 | 0,0264 | 1.500.000,00 | 39.600,00 | ||
| Paku 5 cm – 12 cm | kg | 0,600 | 21.870,50 | 13.122,30 | ||
| Dolken kayuf (8–10) cm panjang 4 m | Batang | 0,500 | 25.000,00 | 12.500,00 | ||
| JUMLAH HARGA BAHAN | 65.222,30 | |||||
| C | PERALATAN | |||||
| JUMLAH HARGA ALAT | ||||||
| D | Jumlah (A+B+C) | 86.379,48 | ||||
| E | Overhead & Profit 10 % | 10% x D (maksimum) | 8.637,95 | |||
| F | Harga Satuan Pekerjaan (D+E) | 95.017,43 | ||||