| No | Uraian | Kode | Satuan | Koefisien |
| A | TENAGA | |||
| 1 | Pekerja | L.01 | OH | 1.650 |
| 2 | Tukang batu | L.02 | OH | 0.275 |
| 3 | Kepala tukang | L.03 | OH | 0.028 |
| 4 | Mandor | L.04 | OH | 0.083 |
| B | BAHAN | |||
| 1 | Semen Portland | kg | 352 | |
| 2 | Pasir beton | kg | 731 | |
| 3 | Kerikil (Maks 30 mm) | kg | 1031 | |
| 4 | Air | Liter | 215 |