| No | Uraian | Satuan | Koefisien | |
| A | TENAGA | |||
| Pekerja | OH | 0.025 | ||
| Tukang besi | OH | 0.025 | ||
| Kepala tukang | OH | 0.025 | ||
| Mandor | OH | 0.001 | ||
| JUMLAH TENAGA KERJA | ||||
| B | BAHAN | |||
| Wiremesh | kg | 10.200 | ||
| Kawat beton | kg | 0.050 |
Situs Tentang Konstruksi & Tender Proyek
| No | Uraian | Satuan | Koefisien | |
| A | TENAGA | |||
| Pekerja | OH | 0.025 | ||
| Tukang besi | OH | 0.025 | ||
| Kepala tukang | OH | 0.025 | ||
| Mandor | OH | 0.001 | ||
| JUMLAH TENAGA KERJA | ||||
| B | BAHAN | |||
| Wiremesh | kg | 10.200 | ||
| Kawat beton | kg | 0.050 |