No | Uraian | Satuan | Koefisien | |
A | TENAGA | |||
Pekerja | OH | 0.025 | ||
Tukang besi | OH | 0.025 | ||
Kepala tukang | OH | 0.025 | ||
Mandor | OH | 0.001 | ||
JUMLAH TENAGA KERJA | ||||
B | BAHAN | |||
Wiremesh | kg | 10.200 | ||
Kawat beton | kg | 0.050 |
Situs Tentang Konstruksi & Tender Proyek
No | Uraian | Satuan | Koefisien | |
A | TENAGA | |||
Pekerja | OH | 0.025 | ||
Tukang besi | OH | 0.025 | ||
Kepala tukang | OH | 0.025 | ||
Mandor | OH | 0.001 | ||
JUMLAH TENAGA KERJA | ||||
B | BAHAN | |||
Wiremesh | kg | 10.200 | ||
Kawat beton | kg | 0.050 |