Pemasangan 10 kg kabel prategang (prestressed) polos/strands


No Uraian
Satuan Koefisien
   
   
A TENAGA
   
  Pekerja
OH 0.050
  Tukang besi
OH 0.050
  Kepala tukang
OH 0.005
  Mandor
OH 0.003
   


B BAHAN      
  Besi beton (polos/ulir)   kg 10.500
  Kawat beton   kg 0.100

0 Comments

Post a Comment

Post a Comment (0)

Previous Post Next Post