Uraian | Satuan | Koefisien |
TENAGA | ||
Pekerja | OH | 0.320 |
Tukang batu | OH | 0.120 |
Kepala tukang | OH | 0.012 |
Mandor | OH | 0.016 |
BAHAN | ||
HB-15 | m3 | 12.500 |
Semen Portland | Kg | 18.200 |
Pasir pasang | m3 | 0.582 |
Besi angker diameter 8 | Kg | 0.280 |
Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP
Tags: