| Uraian | Satuan | Koefisien |
| TENAGA | ||
| Pekerja | OH | 0.260 |
| Tukang batu | OH | 0.200 |
| Kepala tukang | OH | 0.020 |
| Mandor | OH | 0.013 |
| BAHAN | ||
| PC | Kg | 10.368 |
| PP | m3 | 0.031 |