No | Uraian | Kode | Satuan | Koefisien | Harga Satuan (Rp) | Jumlah Harga (Rp) |
A | TENAGA | |||||
Pekerja | L.01 | OH | 0,330 | 88.193,60 | 29.103,89 | |
Mandor | L.04 | OH | 0,010 | 137.609,12 | 1.376,09 | |
JUMLAH TENAGA KERJA | 30.479,98 | |||||
B | BAHAN | |||||
JUMLAH HARGA BAHAN | ||||||
C | PERALATAN | |||||
JUMLAH HARGA ALAT | ||||||
D | Jumlah (A+B+C) | 30.479,98 | ||||
E | Overhead & Profit 10 % | 10% x D (maksimum) | 3.048,00 | |||
F | Harga Satuan Pekerjaan (D+E) | 33.527,98 |
A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter