Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (K350)


No Uraian
Satuan Koefisien
A TENAGA
   
1 Pekerja
OH 2.100
2 Tukang batu
OH 0.350
3 Kepala tukang
OH 0.035
4 Mandor
OH 0.105
     

B BAHAN      
1 Semen Portland   kg 448
2 Pasir beton   kg 667
3 Kerikil (Maks 30 mm)   kg 1000
4 Air   Liter 215

0 Comments

Post a Comment

Post a Comment (0)

Previous Post Next Post