No | Uraian | Satuan | Koefisien | |
A | TENAGA | |||
Pekerja | OH | 0.100 | ||
Tukang kayu | OH | 0.100 | ||
Kepala tukang | OH | 0.010 | ||
Mandor | OH | 0.005 | ||
B | BAHAN | |||
Kayu balok 5/7 | m3 | 0.012 | ||
Paku 2”-3” | Kg | 0.020 | ||
Kayu papan 3/20 | m3 | 0.007 |
Pengukuran dan pemasangan 1 m’ Bouwplank
Tags: