Harga | Jumlah | |||||
No | Uraian | Kode | Satuan | Koefisien | Satuan | Harga |
(Rp) | (Rp) | |||||
A | TENAGA | |||||
Pekerja | L.01 | OH | 6,667 | 88.193,60 | 587.986,731 | |
Mandor | L.04 | OH | 0,333 | 137.609,12 | 45.823,837 | |
JUMLAH TENAGA KERJA | 633.810,568 | |||||
B | BAHAN | |||||
JUMLAH HARGA BAHAN | ||||||
C | PERALATAN | |||||
JUMLAH HARGA ALAT | ||||||
D | Jumlah (A+B+C) | 633.810,568 | ||||
E | Overhead & Profit 10 % | 10% x D (maksimum) | 63.381,057 | |||
F | Harga Satuan Pekerjaan (D+E) | 697.191,625 |
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata